Math, asked by das209486, 2 months ago

000 units 15. The worker-wise production in a department is as follows: A 600 units; B 1,000 units ; C 400 units. Calculate their Earnings as per : (1) Straight Piece Rate System at 10 paise per unit. (i) Differential Piece Rate under which first 400 units at 10 paise per unit, the rate increasing by 2 paise per unit for each subsequent 200 units produced. he piece ​

Answers

Answered by basuhosamanihosamani
1

Answer:

okay thanks and have a great time in the future of our games are at the same for me as soon as possible so

Answered by Anonymous
0

Step-by-step explanation:

Standard output per minute = 1 minute Standard production per hour = 60 units Standard production per day for 8 hours =8× 60 =480 units Normal rate per hour = Rs 5.40 Normal output per hour = 60 units Normal piece rate = Rs 5.40/ 60 Normal piece rate = 9 Now, computing the earnings of Worker using the straight piece rate system as: Earnings of ?Worker A For 390 units at the rate 9 per unit 390 × 9=Rs 3510 ?Earnings of Worker B For 450 units at the rate 9 per unit =450 x 9=Rs 4050 ?Earnings of Worker

Similar questions