(1) 8 men can do a piece of work in 28 days.
.. 1 man does the same in
days.
.. 14 men do the same in
days.
Answers
Answered by
9
1 man=28/8 and 14 men = 2 days
Step-by-step explanation:
if 8 men can do a work = 28 days
1 men can do a work = 28/8 days
14 men can do a work =28/14 = 2 days
Answered by
3
Answer:
8 men= 28 days
1 man = 28÷8= 3.5 days
14 men= 3.5 × 14= 49 days
Similar questions