(1) 8 men can do a piece of work in 28 days.
.. 1 man does the same in
days.
.. 14 men do the same in
days.​

Answers

Answered by mjakhar854
9

1 man=28/8 and 14 men = 2 days

Step-by-step explanation:

if 8 men can do a work = 28 days

1 men can do a work = 28/8 days

14 men can do a work =28/14 = 2 days

Answered by deepakverma82
3

Answer:

8 men= 28 days

1 man = 28÷8= 3.5 days

14 men= 3.5 × 14= 49 days