Math, asked by akshitharun9321, 2 months ago

1. a)The cost of 5.13 metres of cloth is 85.13 Find the cost of cloth per ietre.
b) Find: i) 10 % of 18,000 ii) What
percent of 2 days is 12 minutes? ​

Answers

Answered by ritanagar1986
2

Answer:

1): Cost of 5.13 metres =85.13

Cost of 1 metre. = 85.13/5.13

= 16.59

2): a). 1800×10/100 = 180

b) convert in minutes to 2 hour then,

120/12×100 = 10

Absolutely Correct Answer

Similar questions