1 point
If company wastes Rs. 5,000 in waste treatment using the single continuous process by consuming 100 kg of raw material, how much extra amount (in Rs.) will the company have to pay for waste treatment if it uses the three-batch process.manufacturing company produces three type of products
A
,
B
, and
C
from one raw material in a single continuous process. This process generates total solid wastes
(
W
)
(in kg) as
W
(
r
)
=
−
0.0001
r
3
+
0.1
r
2
+
r
, where
r
is the amount of raw material used in kg. If instead, the company uses three different batch-processes (one batch process for one product) to produce the above products, then the amount of waste generated because of products
A
,
B
, and
C
are given as
W
A
=
−
0.00001
r
4
+
0.015
r
3
,
W
B
=
−
0.005
r
3
+
0.05
r
2
and
W
C
=
0.05
r
2
respectively.
Answers
Answered by
0
Answer:
sorry I didn't understand
Answered by
0
Answer:
the amount company extra pay for three-batch-processes is 500.