Physics, asked by adityayadav770534, 6 months ago

10. A Sherpa of mass 80 kg is instructed to carry a package
of mass 20 kg from the base camp to the summit of a
mountain 1200 m high. (i) How much work the Sherpa
has to do against gravity? (ii) Also, find the change in
potential energy of the package if the potential energy
at the base of the mountain is taken as zero.
(Take g = 10 m s-2) (Ans. 1.2 * 106 J, 2.4 x 1053)​

Answers

Answered by BrainlyAryabhatta
6

Answer:

A Sherpa of mass 80 kg is instructed to carry a package

of mass 20 kg from the base camp to the summit of a

mountain 1200 m high. (i) How much work the Sherpa

has to do against gravity? (ii) Also, find the change in

potential energy of the package if the potential energy

at the base of the mountain is taken as zero.

(Take g = 10 m s-2) (Ans. 1.2 * 106 J, 2.4 x 1053)

Similar questions