10 boys can dig a pitch in 12 hours how long will it 8 boys take to do it
Answers
Answered by
14
Number of boys = 10
Time taken by 10 boys to dig a pitch = 12 hours
Let the time taken by 8 boys to dig a pitch be x hours.
It is a case of inverse variation
10 × 12 = 8x
=> 120 = 8x
=> x = 120/8
=> x = 15
Hence, the time taken by 8 boys to dig a pitch is 15 hours.
Thanks
Time taken by 10 boys to dig a pitch = 12 hours
Let the time taken by 8 boys to dig a pitch be x hours.
It is a case of inverse variation
10 × 12 = 8x
=> 120 = 8x
=> x = 120/8
=> x = 15
Hence, the time taken by 8 boys to dig a pitch is 15 hours.
Thanks
sinharishika340538:
can you please explain
Answered by
6
hope it helps you.............