11. If 12 men or 18 women can complete a piece
of work in 7 days, in how many days can 4 men
and 8 women complete the same work?
Answers
Answered by
4
Answer:
5 days
Step-by-step explanation:
12 men = 7 days
then 1 men = 7/12
i.e 0.5833
also 18 women = 7 days
then 1 women =7/18
i.e 0.38888
therefore 4M+8W = 4(0.5833)+8(0.3888)
2.3332+3.1104
i.e 5.4436
therefore 5 days they need to complete the same work