11 men can dig 6 3/4 meter long trench in one day. How many men should be employed for digging 27meter long trench of same type in one day ?
Answers
Answered by
85
Find the length of the trench 1 man can dig in a day:
11 men = 6 3/4 m long (Given)
1 man = 6 3/4 ÷ 11
1 man = 28/4 x 1/11
1 man = 27/44 m long
Find the number of men needed to dig 27 m long trench:
27/44 m = 1 man
1/44 m = 1 ÷ 27 = 1/27 men
44/44 m = 1/27 x 44 = 44/27 men
27 m = 44/27 x 27 = 44 men
Answer: 44 men is needed to dig 27 m long trench
Answered by
26
Answer:
Find the length of the trench 1 man can dig in a day:
11 men = 6 3/4 m long (Given)
1 man = 6 3/4 ÷ 11
1 man = 28/4 x 1/11
1 man = 27/44 m long
Find the number of men needed to dig 27 m long trench:
27/44 m = 1 man
1/44 m = 1 ÷ 27 = 1/27 men
44/44 m = 1/27 x 44 = 44/27 men
27 m = 44/27 x 27 = 44 men
Answer: 44 men is needed to dig 27 m long trench