Math, asked by sjsjs3851, 1 year ago

12 boys can do a work in 8 days. How many boys are required to same work in 6 days

Answers

Answered by qwwestham
2

The number of boys required to do the same work in 6 days is 16.

Given,

12 boys can do a particular work in 8 days.

To find,

The number of boys required for the same work in 6 days.

Solution,

Firstly, the relationship between the number of men and the time required to finish a work is given by

M_1D_1 =M_2D_2 \hfill ...(1)

where,

M_1 men can finish a particular work in D_1 days, and

M_2 men can finish the same work in D_2 days.

Here, it is given that,

12 boys take 8 days to do a particular work.

Let the number of boys to finish the same work in 6 days be N.

Thus, on substituting the respective values in (1), we get,

12 × 8 = N × 6

Rearranging and simplifying,

N=\frac{12 \times 8}{6} =\frac{96}{6}

N = 16.

So, the number of boys = 16.

Therefore, the number of boys required to do the same work in 6 days is 16.

#SPJ2

Answered by aryanagarwal466
1

Answer:

The boys required are 16.

Step-by-step explanation:

It is given that twelve boys can do a work in eight days.

We need to determine that how many boys are required to so same work in six days.

We know that the relationship between the number of men and the time required to finish a work is given by:

M_{1} D_{1} =M_{2} D_{2}

Here,

M_{1} =12

D_{1} =8

M_{2}=?

D_{2} =6

Using it, we get

12*8=M_{2}*6

M_{2}=96/6=16

We require sixteen boys.

#SPJ2