12men can complete a work in3 days.but 15 women can complete the same work in5 days. so how many men and women together complete the work in 1 day? answer fast and don't spam​

Answers

Answered by xxITZURADITYAKINGxx
10

Answer:

  • 12 men can complete a piece of work in 3 days

  • 15 women can complete the same work in 4 days

  • Let the productivity of men be m and the productivity of women be w

Thus,

  • 12m×4=15w×4

  • =>4m=5w

  • =>m= 4/5w

  • Total work done by women =60w

  • Work done by 6 men in 2 days =6m×2

  • =6× 4/5×2

=15w

  • Thus, remaining work =60w−15w

=45w

  • Let F women complete the remaining job in 3 days

  • Thus, Fw×3=45w

  • =>F= 45/

=>F=15

Thus, 15 women are required to complete the job.