Computer Science, asked by arvind14071987, 1 month ago

13. The first task to complete in the design phase of the SDLC is to
(A) design alternative softwares
(B) select the best design
(C) examine hardware requirements
(D) write a softwares design report​

Answers

Answered by visionajmer2012
0

Answer:

(A) design alternative softwares

Explanation:

Answered by kritikag0101
0

Answer:

The first task to complete in the design phase of the SDLC is to design alternative softwares.

Explanation:

In this phase, the framework and software design reports are ready according to the requirement specification record. This characterizes the general framework design.

This design phase fills in as a contribution to the following phase of the model.

  • DESIGN PHASE Incorporates the design of the application, organization, databases, UIs, and framework interfaces.
  • Change the SRS record into a coherent design, which contains a point by point and complete arrangement of specifications that can be executed in a programming language.
  • Make a possibility, prepare, upkeep, and activity plan.
  • Survey the proposed design. Guarantee that the last design should meet the requirements expressed in the SRS archive.
  • At long last, set up a design report that will be utilized during the next phases.