15 knmetre of work is done by crane in 30 second then power developed kw? -
Answers
Answered by
0
GIVEN:
Work done by crane = 15knmetre
time taken by crane = 30sec
TO FIND:
power developed by crane = ?
SOLUTION:
As work done by crane is given as 15knmeter and time taken given is 30sec.
so power can be calculated by its formula.
i.e, P = W/ t
where P is power W is work done and t stands for time taken
therefore,
P= 15/30
P= 0.5 kw
the SI unit of power is watts (W).
so the power came out to be 0.5kw when its work done is 15knmeter and time taken is 30sec.