Math, asked by himanshu5395, 1 year ago

15 men can dig 7.5 m long trench in one day how many men should be employed for digging 1.5m long trench

Answers

Answered by TooFree
86

Answer:

3 men


Step-by-step explanation:

7.5 m trench = 15 men


Find the number of men need to dig 1 m trench:

7.5 m trench = 15 men

1 m trench = 15 ÷ 7.5 = 2 men


Find the number of men need to dig 1.5 m trench:

1 m trench = 2 men

1.5 m trench = 2 x 1.5 = 3 men


Answer: 3 men


himanshu5395: Wow very fast
TooFree: :)
Answered by aishmeen68
16

Answer:

above is correct answer do that...

Similar questions