Math, asked by shivamdubey8, 1 month ago

175 men can dig 3,150 m of canal in 12
days. How many men are required to
dig 3,900 m of the canal in 8 days?​

Answers

Answered by anmol1383
4

Answer:

= 3900 = 24. = 325. The number of men required = 325

Answered by omkumarbharti15
0

Answer:

Given that 175 men dig a canal 3150m in 36 days.

175=3150=36

?=3900=24

The number of men is required to dig a canal=

3150

(175×3900×36)

=

75600

24570000

Step-by-step explanation:

Right Answer is: C

Number of man days is directly proportional to the length of the canal dug. Hence, 325 men are required to dig a length of 3900 m in 24 days.