Given that 175 men dig a canal 3150m in 36 days.
175 = 3150 = 36.
? = 3900 = 24.
The number of men is required to dig a canal = (175 * 3900 * 36)/(3150 * 24)
= 24570000/75600
= 325.
The number of men required = 325.
Hope this helps!
175 = 3150 = 36.
? = 3900 = 24.
The number of men is required to dig a canal = (175 * 3900 * 36)/(3150 * 24)
= 24570000/75600
= 325.
The number of men required = 325.
Hope this helps!
Answered by
90
Hi ,
Men ( M1 ) = 175 ,
Length ( L1 ) = 3150 ,
Days ( D1 ) = 36.
-----------------------
M2 = ?
L2 = 3900 ,
D2 = 24
( M2 × D2 ) / L2 = ( M1 × D1 ) / L1
M2 = ( M1 × D1 × L2 ) / ( L1 × D2 )
= ( 175 × 36 × 3900 ) / ( 3150× 24 )
After cancellation ,
= 325
Men ( M1 ) = 175 ,
Length ( L1 ) = 3150 ,
Days ( D1 ) = 36.
-----------------------
M2 = ?
L2 = 3900 ,
D2 = 24
( M2 × D2 ) / L2 = ( M1 × D1 ) / L1
M2 = ( M1 × D1 × L2 ) / ( L1 × D2 )
= ( 175 × 36 × 3900 ) / ( 3150× 24 )
After cancellation ,
= 325