175 men can dig a canal 3150 m long in 36 days. How many men are required to dig a canal 3900 m. long in 24 days?
Answers
Answered by
2
the answer is 175 only
Answered by
9
let x men be required
(175×36)/3150=(X×24)/3900
now solve this
(175×36)/3150=(X×24)/3900
now solve this