18 11 men can dig 6-meter lang trench in one day. How many men should be employed
for digging 27 meters long french of the same type in one day?
me per
Answers
Answered by
0
Answer:
Let x be the number of men required to dig a trench of 27 meter.
Number of men 11 x
Length ( in m ) 6
4
3
=
4
27
27
Since, the length of the trench and the number of men are in direct variation, we have:
⇒
x
11
=
27
27/4
⇒ 11×27=x×
4
27
⇒ x=
27
11×27×4
⇒ x=44
∴ 44 men will be required to dig a trench of 27 meter.