Math, asked by yug95014, 8 months ago

18 11 men can dig 6-meter lang trench in one day. How many men should be employed
for digging 27 meters long french of the same type in one day?
me per​

Answers

Answered by hudaattar123
0

Answer:

Let x be the number of men required to dig a trench of 27 meter.

Number of men 11 x

Length ( in m ) 6

4

3

=

4

27

27

Since, the length of the trench and the number of men are in direct variation, we have:

x

11

=

27

27/4

⇒ 11×27=x×

4

27

⇒ x=

27

11×27×4

⇒ x=44

∴ 44 men will be required to dig a trench of 27 meter.