(2) After the pedestrian bridge collapsed at the Elphinstone Road (Prabhadevi
and Parel Railway stations in Mumbai, the Army was immediately called and
a new bridge was constructed within a short time. To find out more about that
incident, the bridge, and the support by the military prepare a questionnaire
to Interview a military officer.
Questionnaire :​

Answers

Answered by Anonymous
27

Answer:

The questionnaire

Explanation:

Questionaire

1.Why was the new Footover bridge needed?

2)Who helped to bridge the new Foot Over bridge?

3)In how many days time was the new Footover bridge ready?

4)Who was responsible for such an incident?

5)Are other bridges in the Mumbai safe?

6)Don't you think there has to be some regular checking on buildings,bridges etc.to check their longitivity every year?

This new Footover bridge was very much needed after the unfortunate stampede that took 23 lives at Elphinstone Road station on September 29, 2017. The FOB linking Elphinstone Road and Parel stations got overcrowded as people took shelter from a downpour. Trapped on the stairs and bridge, there was reportedly a rumour of the bridge collapsing that triggered the panic among people. As the crowds swelled, people were trapped and tried to escape. Many got caught in a stampede which claimed 23 lives and left over 30 injured.

After the pedestrian bridge collapsed at the Elphinstone Road (Prabhadevi

and Parel Railway stations in Mumbai, the Army was immediately called and

a new bridge was constructed within a short time.

Answered by nikitadvaliyavaliya
2

Answer:

how many workers to make a new bridge