2 gents and 5 ladies complete a work in 4 days to complete the same work. Then how many days need to complete the same work for single gent or lady
Answers
Answer:
A single gent can complete the work in 18 hours and a single lady can complete the work in 36 hours.
Step-by-step explanation:
Let the work done by 1 gent alone be m and work done by 1 lady alone be n
Combined rate of work done = 1/4
2m + 5n = 1/4
8m + 20n = 1
n = (1-8m)/20.....(1)
work done by gent + work done by lady = 12
m + n = 1/12
12m + 12n = 1
12m + 12[(1-8m)/20] = 1 ....(from equation 1)
12m + (12-96m)/20 = 1
(240m + 12 - 96m) / 20 = 1
144m + 12 = 20
144m = 20-12
144m = 8
m = 8/144
m = 1/18.....putting in (3)
n = [1-8(1/18)]/20
n = (1 - 4/9)/20
n = (9-4/9)/20
n = (5/9)/20
n = 5/9 × 1/20
n = 5/180
n = 1/36
Hence, work done by 1 gent and 1 lady is 1/18 and 1/36respectively.
so, time taken taken by 1 gent is 18 hours and time taken by 1 lady is 36 hours.
#BAL
#ANSWERWITHQUALITY