Business Studies, asked by parveshjaat22, 4 months ago

2. Material can be:

(A) raw material

(B) work-in-progress

(C) both (a) and (b)

(D) None of these​

Answers

Answered by lekhya38
2

Answer:

I think so (A) is the correct answer

Answered by Anonymous
0

Answer:

Material can be raw or work-in-progress.

Similar questions