2 men and 3 boys together can do a piece of work
in 8 days. The same work is done in 6 days by
3 men and 2 boys together. How long would 1 boy
alone and 1 man alone take to complete the work
independently?
(1) 40 days, 120 days
(2) 120 days, 40 days
(3) 20 days, 120 days
(4) 120 days, 20 days
Answers
Answer:
20 day, 120 days
Step-by-step explanation:
Let the no. of days taken by men be 'x' and thatby boys be 'y'.
According to the conditions given,
the eq can be written as follows...
2/x + 3/y = 1/8.
3/x +2/y = 1/6.
Substitute 1/x = a and
1/y = b
therefore,
2a+3b = 1/8. ... (1)
3a+4b = 1/6. ....(2)
Since we need the denominator as 1
So multiply eq. 1 by 8 and eq. 2 by 6
this way we get the following eqs.
16a + 24b = 1. ...(3)
18a + 12b = 1. ...(4)
Subtract eq.3 and 4,
16a + 24b = 1
- 18a + 12b = 1
-2a +12b = 0
2a = 12b
a = 6b. ...(5)
Substitute eq. 5 in eq.3
16(6b) + 24b = 1
96b + 24b = 1
120b = 1
b = 1/120
substitute the value of b in eq. 4
18a + 12 × 1 /120 = 1
18a + 1 / 10 = 1
18a = 1 - 1/ 10
18a = 9/10
a = 9/10 × 1/18
a = 1/10 × 1/2
a = 1/20
Let's replace the values of a and b
a = 1/20 = 1/x
therefore, x = 20
b = 1/120 = 1/y
therefore, y = 120.