2 men and 4 boys can do a work in 8 days. 4 men and 2 boys can do the work in 6 days. How many days required for 1 man and 1 boys for the same work

Answers

Answered by RvChaudharY50
0

Answer:

8(2M+4B) = 6(4M+2B)

24M - 16M = 32B - 12B

M/B = 5/2

Total work = 8(2*5+4*2) = 144 unit

Done by 1M + 1B in = (144/7) days .(Ans.)