2. You are a concrete manager for
your construction site. Develop a
detailed plan for the mobilization
for procuring, mixing and placing
concrete and concrete equipment
for your site. The total quantity of
concrete to be placed is 10,000
cubic meters approximately.
Aggregates will be procured from
nearby quarry. (10 Points)
Answers
Answered by
0
Explanation:
The quantities of materials for 1 m3 of concrete production can be calculated as follows: The weight of cement required = 7.29 x 50 = 364.5 kg. Weight of fine aggregate (sand) = 1.5 x 364.5 = 546.75 kg. Weight of coarse aggregate = 3 x 364.5 = 1093.5 kg.
Answered by
3
Answer:
A Concrete structure may consists of beams, slabs, columns and foundations etc. based on type of structure. The volume of concrete required for concrete structure can be calculated by summing up the volumes of each structural member or each parts of members.
The volume of a rectangular cross sectional member can be calculated as length x width x height (or depth or thickness). Suitable formula shall be used for different cross-sectional shapes of members.
mark it as branlist
..follow me pls..
Similar questions