20 men can build 10m long wall in 30 days if 3 men leave and 8 men join how much time will be required to build the wall of 40m
Answers
Answered by
1
Answer:
So dealing with ratios.
Remember to find if the quantities are directly or indirectly proportional.
This one has three different variables related to each other.
20:1/10:1/30
More men means less days,Longer walls means more days.
first taking the ration of men to time 20:1/30
multiplying by 1/20 to take out 20 and then multiplying by 20 to replace by 25 so the factor required is 25/20=5/4
25:1/24
now ration for wall to time
1/10:1/24
dividing by 4
1/40:1/96
So the ration comes out to 25:1/40:1/96 hence days required is 96