20 men can dig a tank 40 feet long and 30 feet and broad and 10 feet deep in 25 days. in how many days will 60 men dig a tank 90 feet long, 60 feet broad and 20 feet deep.
Answers
Answered by
2
Answer:
men. dimensions. days
20. 40x30x10. 25
60. 90x60x20. x?
x=20 x 90x6ox 20x25/60x40x30x10
x=75 days. Ans
Answered by
0
Answer:
60 men will dig a tank 90 feet long, 60 feet broad and 20 feet deep in 75 days
Step-by-step explanation:
In first case,
The volume of the tank is 40×30×10= 12000 cubic feet.
Rate of work is=
= 24 cubic feet per man per day.
In second case,
The volume of the tank is 90×60×20 = 108000 cubic feet.
Rate of work is= , where is the number of days to be found out.
= cubic feet per man per day.
Assuming that the rate of work is the same in both the cases, the equation obtained will be=
24=
⇒ = 75 days.
∴ 60 men will dig a tank 90 feet long, 60 feet broad and 20 feet deep in 75 days
Similar questions