20 men can reap a field in 30 days. how many men must be engaged to reap the same field in 24 days?​

Answers

Answered by Soumyadipta07
4

Answer:

The correct answer will be 25 days.

STEP BY STEP EXPLAINATION:

Total number of men required to reap the field in 30 days=20 nos

Total number of men required to reap the field in 1 day=20×30 nos

Total number of men required to reap the field in 24 days={(20×30)÷24}men

=(600÷24)men

= 25 men.

Ans:-Total number of men required to reap the field in 24 days is 25.