22 men can dig 6 m long trench in one day. How many men should be employed for digging 100 m long trench in one day?
*answer*
6 m by 22 men
1 m by 22/6
100 m=22 X 100/6
=2200/6
=366.67
Answer
Answered by
1
Answer:
for 6 m = 22 men
for 1m = 22/6 men