Math, asked by Sohamshaw2006, 2 months ago

250 men need 18 days to dig a pond of 50 meter length and 35 meter breadth. Let's calculate how many days will be needed by 300 men to dig a pond of 70 meter length and 40 meter breadth of the same depth.​

Answers

Answered by soumyaranjankh13
2

Answer:

24 days

Step-by-step explanation:

Pond dimension = 50m × 35m

Area of the pond = 1750m²

250 men need 18 days to dig a pond of 1750 m²

250 men will do in 1 day =1750/18 m²

1 man will do in 1 day = 1750/(18×250) m²

The dimension of the pond to be dug = 70×40= 2800m²

1 man do 1750/18×250 m² in 1 day

1 man will do 2800 m² = 2800/1750/(18×250) = 7200 day

300 men will do the same work in

7200/300= 24 daya

Similar questions