Math, asked by bulasaha2302, 2 months ago

250 men need. 18 days to dig a pond of 50 metre length and 35 metre breadth.
Let's calculate how many days will be needed by 300 men to dig a pond of 70 metre
length and 40 metre breadth of the same depth.​

Answers

Answered by GyanPrakashVema01
0

Answer:

gyan prakash verma

Step-by-step explanation:

  • Given:
  • 250 men - 18 days to dig 50m length and 35m breadth .= 1,750m^2(Area).
  • Then: 300 men = ? days to dig 70 m length and 40m breadth. = 2800m^2(Area).

So;

250 men ------------------ 18 days.

1 man ----------- 18/250 days = 0.072days.

So; 300 men = 0.072×300days = 21.6 days.{Answer}

Answered by Vamsi0609
0

Answer:

24 days

Step-by-step explanation:

Attachments: