250men need 18days to dig a pond of 50metre length and 35metre breadth.lets calculate how many days will be needed by 300men to dig a pond of 70length and 40metr breadth it the same depth
Answers
Answered by
0
Step-by-step explanation:
Given: 250 men - 18 days to dig 50m length and 35m breadth . = 1,750m^2(Area).