3 chefs take 120 min to cook food for a definite number of guests. if the food is to be cooked in 90 minutes how many more chefs are needed
Answers
Answered by
2
Given:
3 chefs take 120 min to cook food for a definite number of guests.
To find:
The number of chef required to cook the same food in 90 minutes.
Solution:
Let the number of chef is M
As per the given condition of the question, the total work done by the chefs would be the same in both cases.
So the total work done by the 3 chefs is given by:
- 3×120
- 360 units
and the number of chefs required to complete the same work in 90 minutes is given by:
- 360 = M×90
- M = 360/90
- M = 4
Hence four chefs can complete the same work in 90 minutes.
Answered by
0
Answer:
nwnnanabababababa a ababababbaa
Step-by-step explanation:
bsnababa
Similar questions