3. Following are values of silt content of three different samples.
i. Silt Content - 8 %
ii. Silt Content = 3%
iii. Silt Content = 4%
Write the Suitability of sand for various construction works.
1
Answers
Answered by
3
Answer:
in the second place the construction works are suitable
Similar questions