3 men and 4 boys can do a piece of work in 14 days while 4 men and 6 boys do the same work in 10 days how long would it take one man to finish the same work
Answers
Answered by
1
Step-by-step explanation:
3x + 4y= 14 ______(1)
4x+ 6y = 10 ______(2)
By using Elimination method:
multiple eq 1 by 4 and eq 2 by 3.
12x + 16y=56______(3)
12x + 18y= 30______(4)
Adding 3 and 4
we get y = -13
put the value of y in eq 1
3x + 4y = 14
3x+ 4(-13)=14
3x+(-52)= 14
3x=14 + 52
3x= 66
x=22