30 children can do a piece of work in 16 days. How many children would be required to do the same work in 20 days
Answers
Answered by
0
16 * 30 = 480/20 = 24
24 children are required
24 children are required
Answered by
1
no of children=30
days taken= 16
=30/16=×/20
=x×16=30×20
x=30×20/16
therefore, x = 75/2= 37.5
days taken= 16
=30/16=×/20
=x×16=30×20
x=30×20/16
therefore, x = 75/2= 37.5