30 men can do a piece of work in 16 days.in how many days 8 men can do the same work?
Answers
Answered by
34
30 men can do a piece of work in 16 days
If one man was to do the work , he would take 30 x 16 = 480 days
So, if 8 men were to do the work,
Days required =
480/8 = 60
8 men would be able to do the same work in 60 days