30. The end products consume resources in the proportion to the volume of production is the assumption of:

a) Activity based costing system
b) Traditional costing system
c) Hybrid costing system
d) All the above​

Answers

Answered by Jasmine1156
5

highcourt a great time to meet the criteria of this communication and interpersonal the other two years in this thread in your area for you guys I can you give us some other people in this thread in your area for you guys I was in this thread in your area for you guys I was in your area for you guys 7

Answered by Anonymous
0

It is the assumption of Activity based costing system

  • is a method for calculating manufacturing costs. It divides operating costs into various production-related operations.
  • Every operation that goes into manufacturing, such as staff inspecting a product, is costed using the ABC scheme.
  • Under this method, It is assumed that end goods consume resources in proportion to output volume.