Math, asked by habibulbas2000, 10 months ago

32. The plinth area rate and plinth area of a building
is Rs 5500 per sq.m and 150 sq.m respectively.
What is the total cost (Rs.) of building considering
cost of electrification as 7%, cost of sanitary
fittings as 16%, cost of roads and lawns as 6.5%
and cost of contingencies as 4.5%.​

Answers

Answered by bhat0sajad113
0

are rate and plinth xhbdbdjsbsvsjbw wisns hdjs didn't dhvdbdjd

Answered by nareshbhardwaj090
0

Answer:

the plintharea and plinth area rate of a residentail building 100spm and 5000rs determaine the total cost of building assuming suitlbe provison

Similar questions