Answer: 240 rs.
Step-by-step explanation:
- area of plot = total rate for ploughing/ rate of per square plat = 1008/7= 144 square metre
- area of square plot = (side * side)= 144 square metre
- so side will be = 12 metre
- now length of fencing its boundary = perimeter of the plot = (4* side)
- 4* 12= 48 metres
- cost of fencing = rs. 5/metre
- complete cost of fencing its boundary will be = (perimeter of plot * rate per metre) = 48 *5 = 240 rs.
Answered by
0
Answer:
area of plot = total rate for ploughing/ rate of per square plat = 1008/7= 144 square metre
area of square plot = (side * side)= 144 square metre
so side will be \sqrt{144}144 = 12 metre
now length of fencing its boundary = perimeter of the plot = (4* side)
4* 12= 48 metres
cost of fencing = rs. 5/metre
complete cost of fencing its boundary will be = (perimeter of plot * rate per metre) = 48 *5 = 240 rs