4. The ratio between maximum demand to connected load is
a) Demand factor
b) Load factor
I
c) Utilisation factor
d) Plant capacity factor​

Answers

Answered by 7777777RAM
0

Answer:

Load factor is the answer

Answered by Anonymous
0

In the context of electricity,the diversity factor (or simultaneity factor. ) is the ratio of the sum of the individual non-coincident maximum loads of various subdivisions of the system to the maximum demand of the complete system. The diversity factor is always greater than 1.