40 men can build a wall 20 m high in 15 days. The number
of men required to build a similar wall 25 m high in 6 days
will be:
Answers
Answered by
0
Answer:
70 men
can build 25 m high wall in 6 days
Answered by
4
Answer:
125 men
Step-by-step explanation:
20m wall can be built by 40 men in 15 days
So 1m wall can be built by 40/20 =2 men in 15 days
So 25m wall can be built by 2x25 = 50 men in 15 days
So 25m wall can be built in 1 day by 50 X 15 men = 750 men
Hence the wall can be built in 6 days by 750/6 = 125 men
hope you understand
please make it a brainlist answer