10 days is the right answer
Step-by-step explanation:
A can do a piece of work 8 days and B can do in 16 days . Both start to work together but A left after 2 days . how much did they work in 2 days? How long would B alone take to finish the remaining work?
Solution: A does (1/8)th in 1 day and B does (1/16)th in 1 day.
In the first 2 days, A and B did (2/8)+(2/16) or (4/16)+(2/16) = 6/16 or 3/8th.
The remaining (5/8)th of the work will be done by B alone in (5/8)/(1/16) = 10 days. Answer