5. A bridge can be constructed by 1800 workers in
50 days. How many more such workers should be
employed to complete the work in 30 days?
6. Thirty-five cows can clear a field by grazing in 15
days. How many cows will graze the same field in
7 days?
7. 21 pumps can empty a water tank in 36 hours.
How many hours would 56 pumps take to do the
same work?
Answers
Answered by
1
120 more workers are needed to build the bridge in 30 days.
75 cows can grace the field in 7 days.
6 hours and 45 minutes would be required to drain off the pump.
Hope it helps you.
Answered by
0
Answer:
5. 1800×50=30×X
X=3000 wokers
6.35×15=7×X
X=75 cows
7.21×36=56×X
X=13.5 hours