5. Find the cost of levelling a playground 51 m long and 40 m wide at 35 per square metre. Also, find
the cost of fencing it at 50 per metre.
Answers
Answered by
1
Answer:
71400 is the cost of levelling
9100 is the cost of fencing
Answered by
0
Answer:
for levelling rs 71,400
for fencing rs 9,100
Step-by-step explanation:
area is 40×51.
cost for levelling is area×cost per unit area.
perimeter is 2(40+51)
cost of fencing is perimeter×cost per unit meter
Similar questions