Computer Science, asked by anurima99, 2 months ago

5. Time allowed for the production of looBolt is 2 hours and the hourly wage rate is Rs. 12/- M&N
produced 600 and 500 pieces of Bolt respectively in a particular day of 8 hours Calculate their earnings
under Halsey Premium Bonus Method and Rowan Premium Bonus Method.​

Answers

Answered by cutiegirl47
0

Answer:

the other side of a new window, radiator, power and torque, but I have a great time at the same time I have to be able to do with the

Similar questions