Math, asked by seema940700, 3 months ago

6. 'क' तथा 'ख' किसी काम को 4 दिन में करते हैं. यदि 'क,
अकेले उसे 6 दिन में करता है तो 'ख' अंकले उसे कितने दिन
में पूरा
करेगा?
(A) 10 दिन
(C) 16 दिन
(B) 12 दिन
(D) 20 दिन

Answers

Answered by triggeredboy793
1

Answer:

12 days

Step-by-step explanation:

work can be done by A in 1 day = 1/6

work can be done by A and B together = 1/4

let,

work can be done by B in 1 day =1/x

1/6 +1/x =1/4

1/x = 1/4 - 1/6

1/x = 6-4 / 24

1/x = 2 / 24

1/x = 1/12

x=12

hence B can do work in 12 days.

Answered by ashwin0206k
0

Answer:

raat me milna kabhi bata denge

how to s3x...besharam

Step-by-step explanation:

AB is the straight line

∠AOQ+∠BOQ=180

o

∠BOQ=180

o

−58

∠BOQ=122

o

In triangle BOQ,OB+OQ are equal since they are radius of the circle (OB=OQ)

So ∠OBQ=∠OQB (Since sides opposite are equal angle opposite to the equal sides are equal)

So ∠OBQ+∠OQB+∠BOQ=180

o

122

o

+2(∠OBQ)=180

o

→∠OBW=29

o

In triangle ABT⇒∠ABT+∠BAT+∠BTA=180

o

=29

o

+90

o

+∠BAT=180

o

∠ATQ=61

o

Similar questions