6) Time required by an average skilled operator working at a normal pace to perform a specified task using a prescribed method is called as _______.
a) Standard time
b) Machining time
c) Dwell time
d) Handling time
Answers
Answered by
0
Answer:
Standard time.
Explanation:
the standard time is the time required by an average skilled operator, working at a normal pace, to perform a specified task using a prescribed method.
Answered by
1
Answer:
a) standard time
Explanation:
In industrial engineering, the standard time is the time required by an average skilled operator, working at a normal pace, to perform a specified task using a prescribed method.
Similar questions