7. A can do a piece of work in 14 days which B can do it in 21 days. They begin together but 3 days
before the completion of the work, A leaves off. Find the total number of days taken to finish work
(Ans: 8.5 days)​

Answers

Answered by prajwallakra05
1

Answer:

let A and B be x and y respectively

work done by A = 1/14

work done by B = 1/21

work done by both in 1 day = 1/14+1/21 = 5/42

work done in 3 days by both = 5/42×3 =15/42

as A has left

work done by B = 15/42÷1/21 =15/42×21 = 15/2

total days taken to complete = 5/42 + 15/2

= 5+315/42

= 320/42

= 7.6