7. Find the cost of digging a cuboidal pit 8 m long, 6 m
broad and 3 m deep at the rate of 30 per m^3
(pls give full explanation)
Answers
Answer:
Answer is 4320.
Step-by-step explanation:
length=8m
b=6m
h=3m
volume of cuboidal pit=l×b×h
=(8×3×6)m cost of digging 1 metre = rs30
cost of digging 144m=(144×30)
=RS4320
therefore, cost of digging the pit is rupees 4320 .
Question :-
⇒ Find the cost of digging a cuboidal pit 8 m long,
6 m broad and 3 m deep at the rate of 30 per m³
Given :-
→ Length = 8m
→ Breadth = 6m and
→ Height = 3m
→ Rate per m² = Rs. 30
To Find :-
→ Cost of digging at the rate of Rs. 30 per m³
Solution :-
→ Total cost = Total surface area × 30
→ Total Surface Area
= 2(lb + bh + hl)
→ 2[ (8×6) + (6×3) + (3×8) ] ×30
→ 2( 48 + 18 + 24) ×30
→ 2(90) × 30
→ 180 × 30
∴ Rs. 5400 is the total cost to dig the pit