70 men can complete a wall of 150 metre in 12 days. How many men will complete the Wall of 600 metre in 30 days.
Answers
Answered by
5
70 men = 150 meter = 12 days
? men = 600 meter = 30 days
one men = 150 meter = 70*12 days = 840 days
one man = 1 meter wall = 840 /150 =5.6 days
one man = 600 meter = 5.6*600 =3360 days
the works need to be complete in 30 days.
so lets X no of men are required for them
since
X*30 = 3360
X = 3360/30 =112 men