8. Find the cost of polishing a circular table-top of diameter 1.6 m,if the rate of polishing is *15/m²
(Take n = 3.14)
Answers
Answered by
45
Answer:
ar of circular table *15/m=cost
3.14* 0.8*0.8*15
Rs 30.14
Answered by
40
Answer:
- Rs 30.144 is the total cost of Polishing.
Step-by-step explanation:
Given:-
- Diameter of circular table ,d = 1.6 m
- Rate of polishing = Rs 15/m²
To Find:-
- Cost of Polishing the table
Solution:-
Firstly we calculate the area of circular table.
Radius of Circular Table = d/2
→ Radius of Table = 1.6/2 = 0.8 m
• Area of Circular Table = πr²
Where,
- π denotes 22/7 ≈ 3.14
- r denote radius
Substitute the value we get
→ Area of Circular Table = 3.14 × 0.8²
→ Area of Circular Table = 3.14 × 0.64
→ Area of Circular Table = 2.0096
Now, Calculating the Total cost of Polishing the surface of table.
→ Total cost = Area × Rate of Polishing
→ Total cost = 2.0096 × 15
→ Total Cost = Rs 30.144
- Hence, the total cost of Polishing the surface of table is Rs 30.144 .
Similar questions